VANTAGE VALLEY ECOYOUR HOME. YOUR NEXT CHAPTER.
California · Education only

Net Billing, in language a homeowner can use.

Commonly called NEM-3, though the CPUC calls it the Net Billing Tariff. It changed what a kilowatt-hour sent to the grid is worth, which changed nearly everything downstream. Here is the mechanism, with the state's own page cited for each piece.

Reviewed by Vantage Valley Eco Last updated

This page is education only. Vantage Valley Eco offers homeowner solar education conversations in California. This guide does not collect contact information or offer an installation service.

No form, no address field, nothing to sign up for. California residents can read about their data rights at the California Attorney General's CCPA page.

The names, untangled

Three terms get used for overlapping things, and the confusion is not accidental. It is useful to anyone selling into it.

Who it applies to

The CPUC states that the Net Billing Tariff became effective April 15, 2023, for new customer applications. PG&E states the same boundary from its side: customers who submitted an interconnection application after April 14, 2023, are enrolled on the Solar Billing Plan.

The application date is the thing that matters, not your installation date and not your signature date on a sales contract. If you are being told which tariff you will be on, ask which date that determination is keyed to and get the answer in writing.

How exported energy is valued now

This is the substance of the change. Under the Net Billing Tariff, per the CPUC, export credits are applied to a customer's bill at a rate reflecting the value of that generation to the grid, using CPUC Avoided Cost Calculator values, which the CPUC notes are usually lower than retail rates, though the CPUC also notes that compensation can occasionally exceed retail rates during late summer evenings.

Three consequences follow, and they are the whole reason the California solar conversation sounds different than it did a few years ago:

What happens to people who already had solar

The CPUC states that existing NEM 2.0 customers are allowed to remain on the NEM 2.0 tariff for 20 years from the date they interconnected, with the option to switch to current tariffs. NEM 1.0 closed to new enrollments following sunset dates in 2016 and 2017.

This matters when you buy a house with solar already on it, and it matters if anyone suggests you add capacity to an existing system. Changes to an existing system can affect which tariff you are on. Before modifying a system that is on a legacy tariff, confirm in writing with your utility what the modification does to your tariff status. That question has a real dollar answer and it is not always the one you expect.

The CPUC also describes a nine-year period tied to the export price schedule that applies when a customer first interconnects. The eligibility conditions on that are specific, so read them on the CPUC's page rather than in a summary, this one included.

What the tariff does not do

Before you sign anything in California

The state's own protections are listed in the California Solar Consumer Protection Guide: you must receive the Solar Energy System Disclosure Document before signing, you are entitled to the contract in the language the salesperson spoke to you, you have at least three business days to cancel (five if you are 65 or older), and savings calculations may not assume electricity rate increases above 10% as of 2025. Verify any contractor's license at the Contractors State License Board before signing. The guide names C-46, C-10 and B as the valid classifications.

On federal tax credits: the IRS states the residential clean energy credit "is not available for any property placed in service after December 31, 2025." That date has passed. Read the IRS page and speak to a qualified tax professional about your own position. Nothing here is tax advice.

Keep reading

How solar is credited in Arizona

APS RCP export rate: $0.05554/kWh for the 2026 tranche. That covers customers who apply Sep 1, 2026 – Aug 31, 2027 (ACC Decision No. 82122). Each customer's initial RCP rate applies for 10 years from interconnection. Source: APS Rate Rider RCP · Applications Sep 1, 2026 – Aug 31, 2027

SRP E-16 and E-28 export credit: $0.0187/kWh, "Effective as of the May 2026 Billing Cycle; subject to adjustment." It is recalculated each May from a 3-year average of hourly energy prices. Source: SRP ratebook, published Apr 27, 2026 · Effective as of the May 2026 Billing Cycle

On SRP E-15 and E-27, exports are netted against imports each billing cycle, tracked by TOU period. Any net excess is credited "at the retail per-kWh price under this price plan." Source: SRP E-15; SRP E-27

Solar exports on APS

APS RCP export rate: $0.05554/kWh for the 2026 tranche. That covers customers who apply Sep 1, 2026 – Aug 31, 2027 (ACC Decision No. 82122). Each customer's initial RCP rate applies for 10 years from interconnection. Source: APS Rate Rider RCP · Applications Sep 1, 2026 – Aug 31, 2027

RCP export rate by year: 2017 $0.12900 · 2018 $0.11610 · 2019 & 2020 $0.10450 (one rate held two years, Oct 2019 – Sep 2021; no 2020 cut) · 2021 $0.09405 · 2022 $0.08465 · 2023 $0.07619 · 2024 $0.06857 · 2025 $0.06171 · 2026 $0.05554. Source: APS Rate Rider RCP

Any cut to the RCP "will be no greater than 10% of the previous RCP." Source: APS RCP Plan of Administration

A "material increase in capacity means increasing the capacity by 10% or 1 kW-ac, whichever is greater." After one, bill credits use the current RCP rate for the rest of the 10 years. Source: APS Rate Rider RCP

Adding a grid-interactive battery requires a new Interconnection Application. Source: APS Interconnection Requirements

Solar exports on SRP

SRP E-16 and E-28 export credit: $0.0187/kWh, "Effective as of the May 2026 Billing Cycle; subject to adjustment." It is recalculated each May from a 3-year average of hourly energy prices. Source: SRP ratebook, published Apr 27, 2026 · Effective as of the May 2026 Billing Cycle

On SRP E-15 and E-27, exports are netted against imports each billing cycle, tracked by TOU period. Any net excess is credited "at the retail per-kWh price under this price plan." Source: SRP E-15; SRP E-27

What this page cannot tell you

Sources

Every factual claim above traces to one of these. Check them yourself, because that is what they are for.

All guidesThe homeowner libraryVantage Valley Eco home